What is CorrOpti
CorrOpti is a corrugator scheduling tool
that generates optimal corrugator schedules. It
provides various optimization criteria for
the user to select from, including:
- minimum trim ratio
- maximum profit
- maximum profit rate
- maximum utilization
- minimum time
- minimum cost
- minimum cost per unit area
- maximum profit per unit area
- Minimum trim area
CorrOpti is a true optimizing scheduler.
It is mathematically guaranteed to generate
schedules that are unsurpassable on the
selected criterion. Despite performing
absolute optimization, CorrOpti is amazingly
efficient. On a typical desktop PC, it
generates a schedule for tens of orders in
unnoticeable time.
The efficiency and responsiveness of
CorrOpti make it usable in various what-if
scenarios related to corrugator scheduling.
Examples of such scenarios include:
- How would adding order X to the run
affect the run-time and the
profitability of the maximum-profit-rate
schedule?
- How less will the profit be if we
minimize time instead of maximizing
profit?
- How will upgrading order X and
including it in the run affect the
profit rate?
- How will the trim ratio be affected
if we use a single roll-size to avoid
roll-size changes?
When maximizing the profit or the profit
rate, CorrOpti not only accounts for the
cost, but also for the revenue. Furthermore,
CorrOpti takes advantage of the allowed
quantity overruns and underruns to decide on
the exact quantities that will optimize the
schedule on the selected criterion.
To cope with real world situations when
optimizing on profit or on profit rate,
CorrOpti allows variation in pricing for
orders of the same board type. Orders of the
same board type may vary in price for
various reasons, including discounts and
quality upgrades. Such pricing
discrepancies, if any, are perfectly
accounted for in generating an optimal
schedule.
For order-split control, CorrOpti
provides a tool that lets the user
interactively maneuver through different
sequencings of the schedule steps, and
visualize the effects on order splits along
the way.
CorrOpti is easy to use for anyone
familiar with the corrugated cardboard
industry. A typical session of use starts
with entering the scheduling input through a
multi-tab window, and then clicking the
schedule button. The generated schedule is
then detailed in another multi-tab window.
Features
- Various optimization
criteria to accommodate different production
circumstances
- Simultaneously generating
schedules based on all optimization criteria
and comparing them
- Optimization of the actual profit and
profit rate directly, not only via their
correlates (trim ratio and utilization)
- Scheduling for corrugators with 2 or 3
cut-off knives
- Usability in various what-if scenarios
- Optimal use of the permissible overruns
and underruns
- Accounting for both revenues and costs
when maximizing the profit or the profit
rate
- Providing cost and revenue breakdowns
for each schedule
- Supporting multiple-sheet
box designs
- Visual tool for order-split control
|